KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  12-17-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Finishing up D55/1

Grinded all the edges of D55/1 part 3 smoothly.
Drilled the 4 holes of each actuator (part 3) and bolted the 2 pertinax wheels to the part 3 with M4 bolts. Additionally I secured the bolts with loctite and marked them with red Loctite Varnistop 7400. Drilled the S-5 hole into part three that takes up bolt 4 (M5) later on. The left actuator was drilled together with the drive tube with the correct offset according to the plans.
' style=

Holes perfectly in Alignment for the 3mm Steelcable

Holes perfectly in Alignment for the 3mm Steelcable

' style=

Drilling S-5 Hole with a 4.9 Driller and used a Reamer for correct seating

Drilling S-5 Hole with a 4.9 Driller and used a Reamer for correct seating

' style=

M5 Bolt with a Shaft of 40mm length

M5 Bolt with a Shaft of 40mm length

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.